Station Pointe is a redevelopment of the historic Fort Road Old Town area in Edmonton, Alberta. Phase I of the project is a mixed-use development where people can live, work, shop, and attend community events and programs. The design will include rainwater harvesting, on-site biological water treatment, natural ventilation, passive solar, solar thermal and solar PV, heat recovery, and efficient control strategies. A district energy system will have the potential of energy sharing with future phases of the project and with neighboring industries. Station Pointe is targeting net zero energy use and is located next to a Light Rail Rapid Transit (LRT) Station and bus terminal making it the new exemplary model for sustainable living.

Services Provided: Energy Code Compliance (NECB)

Key Highlights/Accomplishments: natural ventilation passive solar solar thermal and solar PV heat recovery efficient control strategies

Sector: Commercial – Retail/Multi-family Residential

Northern Development and Investment Group Audit and Solar Project

3d-energy-northern-dev-invest-group-audit-solar-project-featured

This facility is a single-story office building that was constructed circa 1976. The building has a total floor area of approximately 58,700 ft².

With three major tenants. After completing an analysis of the building’s exterior and interior envelope, heating/mechanical equipment, lighting equipment, windows, doors, and other systems and interviewing the maintenance staff, 3D Energy brought forward recommendations that included: Near Condensing Boiler Upgrade; Outdoor Condensing Unit Upgrade; Variable Speed on AHU Fans; Pneumatic to Electronic Control Conversion; Interior & Exterior Lighting Upgrade; Low Flow Water Fixtures; Insulation Upgrade; Programmable Thermostats; and Heat Recovery. Additionally, 3D Energy made a number of recommendations for the end of lifecycle equipment replacement.

Services Provided: ASHRAE Level 2 Detailed Energy Audit

Key Highlights/Accomplishments: Identified Annual Cost Savings – $23,127 Identified Annual GHG Reductions – 237 tonnes of C02

Sector: Commercial – Office Space

Allan & Jean Millar Recreation Centre

3d-energy-allan-jean-millar-centre-featured

3D Energy was engaged to complete a Detailed Energy Audit (ASHRAE Level 2) on this facility.

As the prime contractor, 3D Energy performed the vast majority of the work including the site visit, energy modeling, analysis, and reporting, with some mechanical & electrical support from our sister company Vital Engineering as needed.

This recreation multiplex located in Whitecourt, AB includes offices, commercial space, lounge, children’s play area, conference facilities, running track, fitness centre, fieldhouse, and an indoor water park. We identified a total of nine ECMs including air handling unit variable frequency drives, pool variable frequency drives, low flow faucets, lighting occupancy sensors, lighting upgrades to LED, and a combined heat & power (cogeneration) unit installation.

The recommended measures would have a simple payback of five years and take the equivalent of 340 cars off the road each year.

Services Provided: ASHRAE Level 2 Detailed Energy Audit

Key Highlights/Accomplishments: Funded by MCCAC through TAME+ Program Identified Annual Cost Savings – $147,000 Identified Annual GHG Savings – 1,600 tonnes of CO2

Sector: Government – Municipal

Bio-Safety Cabinet Installation

vital-engineering-bio-safety-cabinet-install-featured

Biological safety cabinets were added to two buildings: The Cross Cancer Institute and the Walter C. MacKenzie building.

Supply air was adjusted within the spaces for increased airflow; new exhaust fans were selected for the rejected air stream, including new Strobic fans for the Cross Cancer Institute. Sensitive balancing, directional airflow, and general VAV upgrades followed as a result. Biological safety cabinet system design has many of the same rigors as fume hood design, except that the BSCs protect the product in addition to the users of the device.

Services Provided: Mechanical Engineering

Key Highlights/Accomplishments: Pharmacy Air Systems

Sector: Institutional – Health Care

St. Joseph 4-12 School (Whitecourt)

vital-engineering-st-joseph-school-whitecourt-featured

This new school, budgeted at $21,894,000.00, was delivered as a design-build for grades 4 through 12 in Whitecourt, Alberta.

The project was completed in 2017. The school uses displacement ventilation for cooling and fresh air; building heat is provided by hot water heating to radiant panels from mid-efficient gas-fired boilers. Both enthalpy wheels and core type heat recovery ventilators were employed on the air systems. Occupancy controls and demand controlled ventilation were implemented to save operating costs.

Services Provided: Mechanical Engineering Services Civil Engineering Services; LEED Energy Modelling

Key Highlights/Accomplishments: LEED Gold; Industrial Arts Dust Collector; Science classroom with chemical fume hood; radon gas mitigation system

Sector: Institutional – Education

P143 Metalworking Shop Plasma Cutter

vital-engineering-p143-metalworking-shop-featured

NAIT’s metalworking shop purchased a plasma cutter- VEC provided the engineering for the necessary building infrastructure.

This included a pulse-controlled dust collector, welded industrial exhaust duct, and piping/controls for various exotic compressed gases (specified to medical gas standards). The addition of a spark arrestor permitted the plasma machine to be used on several different types of metal.

Services Provided: Mechanical Engineering Services; Electrical Engineering Services

Key Highlights/Accomplishments: Fume/Dust Collection System

Sector: Industrial; Institutional – Education

NAIT V102/V111 Carpentry Shop Dust Collection System

vital-engineering-nait-carpentry-shop-dust-collection-featured

The carpentry shop at NAIT went through a major overhaul, with existing and new equipment re-configured within the space.

Existing dust collectors were retained while most of the exhaust ducts were demolished; new ducts and blast gates run to the new equipment locations. Compressed air connections were also relocated per new equipment configurations. Vital ensured all relevant NFPA, SMACNA, and Industrial Ventilation standards were upheld and helped the users develop control strategies to mitigate the diversity of loads within the system.

Services Provided: Mechanical Engineering Services; Electrical Engineering Services

Key Highlights/Accomplishments: Quick Turnaround

Sector: Industrial; Institutional – Education

Ardrossan School

vital-engineering-ardrossan-school-featured

This new elementary school, budgeted at $13,694,000.00, was delivered as a design build in Ardrossan, Alberta. The project was completed in 2018.

The school uses displacement ventilation for cooling and fresh air; building heat is provided by hot water heating to radiant panels from mid-efficient gas fired boilers. Heat recovering enthalpy wheels were employed on the main air system. Occupancy controls and demand controlled ventilation were implemented to save operating costs.

Services Provided: Mechanical Engineering

Key Highlights/Accomplishments: LEED Gold Pending, early childhood education classrooms, radon gas mitigation system

Sector: Institutional

Zenchyson Solar Array 6.5 kW

generate-energy-zenchyson-solar-array-featured

The ground mount solar array consists of 20 solar modules facing directly south.

One DC power optimizer has been installed behind each solar module with conductors connecting the solar array to a single 5.0kW inverter.

Equipment
Solar modules: 20 Canadian Solar 325-watt solar modules
Optimizers: 20 Solar Edge P-400 power optimizers
Inverter: Solar Edge 5.0kW inverter
Racking: Malina M43 4×5

Services Provided: Design, permitting, engineering, rebate application, installation and commissioning

Key Highlights/Accomplishments: Trenching and screw anchor installation for ground mount racking system.

Sector: Farm

Wilson & Romanko Solar Array 15.5 kW

generate-energy-wilson-romanko-solar-array-featured

One DC power optimizer has been installed behind each solar module with conductors connecting the solar array to a single 11.4kW inverter.

The solar array consists of two sub arrays; 26 solar modules mounted to the South-West roof face and 25 solar modules mounted to the North-East roof face of the residence.

Equipment
Solar modules: 51 Hanwha 305-watt solar modules
Optimizers: 51 Solar Edge P-320 power optimizers
Inverter: Solar Edge 11.4kW inverter

Services Provided: Design, permitting, engineering, rebate application, installation and commissioning

Key Highlights/Accomplishments: Main electrical panel upgrade with solar PV installation.

Sector: Residential