Petwin Tower – Petwin Properties

3D Energy

3D Energy has performed a walkthrough of the Petwin Tower building and carried out an energy analysis of three Petwin Properties.

3D Energy then produced a detailed energy assessment which includes the detailed results of the energy analysis and a full description of upgrades that can be completed to make the building more energy efficient.

12 Energy Conservation Measures Recommended:
LED Lighting Upgrade, Low Flow Water Fixtures, Insulate Hot Water Pipes, Boiler Upgrade, Self-Sensing Pumps, Heating Fluid Additive, Air Handling Unit Upgrade, Hydronic Heating Valves, Variable Speed Fans, Recommissioning, No-Cost Measures, and Low-Cost Measures

Key Highlights/Accomplishments: $84,165 annual cost savings, 502,996 kWh annual electrical savings, 9.2 years simple payback, and 659 tonnes of CO2
Sector: Office Tower

© 2020 Vital Group of Companies