Projects

P143 Metalworking Shop Plasma Cutter
NAIT’s metalworking shop purchased a plasma cutter- VEC provided the engineering for the necessary building infrastructure. This included a pulse-controlled dust collector, welded industrial exhaust

NAIT V102/V111 Carpentry Shop Dust Collection System
The carpentry shop at NAIT went through a major overhaul, with existing and new equipment re-configured within the space. Existing dust collectors were retained while

Ardrossan School
This new elementary school, budgeted at $13,694,000.00, was delivered as a design build in Ardrossan, Alberta. The project was completed in 2018. The school uses

Zenchyson Solar Array 6.5 kW
The ground mount solar array consists of 20 solar modules facing directly south. One DC power optimizer has been installed behind each solar module with

Wilson & Romanko Solar Array 15.5 kW
One DC power optimizer has been installed behind each solar module with conductors connecting the solar array to a single 11.4kW inverter. The solar array

Willcott Solar Array 12.2 kW
The ground mount solar array consists of two rows of 18 solar modules, each facing directly south. The array is comprised of four sub-arrays of