
NREF Fume Hood, Ventilation, & Controls Upgrade
Fume Hood, Ventilation, and Controls upgrades were made to the Natural Resources Engineering Facility building at University of Alberta. The NREF Fume Hood, Ventilation, and Controls
Fume Hood, Ventilation, and Controls upgrades were made to the Natural Resources Engineering Facility building at University of Alberta. The NREF Fume Hood, Ventilation, and Controls
Biological safety cabinets were added to two buildings: The Cross Cancer Institute and the Walter C. MacKenzie building. Supply air was adjusted within the spaces
This new school, budgeted at $21,894,000.00, was delivered as a design-build for grades 4 through 12 in Whitecourt, Alberta. The project was completed in 2017.
NAIT’s metalworking shop purchased a plasma cutter- VEC provided the engineering for the necessary building infrastructure. This included a pulse-controlled dust collector, welded industrial exhaust
The carpentry shop at NAIT went through a major overhaul, with existing and new equipment re-configured within the space. Existing dust collectors were retained while
This new elementary school, budgeted at $13,694,000.00, was delivered as a design build in Ardrossan, Alberta. The project was completed in 2018. The school uses
One DC power optimizer has been installed behind each solar module with conductors connecting the solar array to a single 11.4kW inverter. The solar array
The ground mount solar array consists of two rows of 18 solar modules, each facing directly south. The array is comprised of four sub-arrays of
The ground mount solar array consists of two sub-arrays of 9 solar modules, each facing directly south. One DC power optimizer has been installed behind
This Solar PV system consists of two sub-arrays. One sub-array consists of 33 solar modules mounted on the South facing roof of the shop; the