Mechanical Engineering

This new elementary school, budgeted at $13,694,000.00, was delivered as a design build in Ardrossan, Alberta. The project was completed in 2018. The school uses displacement ventilation for cooling and fresh air; building heat is provided by hot water heating to radiant panels from mid-efficient gas fired boilers. Heat recovering enthalpy wheels were employed on the main air system. Occupancy controls and demand controlled ventilation were implemented to save operating costs.

Services Provided: Mechanical Engineering
Key Highlights/Accomplishments: LEED Gold Pending, early childhood education classrooms, radon gas mitigation system
Sector: Institutional